OT - Any strutural engineers on here today ?
I've got a bit of a problem with a structure I'm designing at work, basicaly I need to reduce the wind load on it....
Its only a tempery structure, but its going to up throught the winter so I can't save anything on the seasonality factors
I'm using BS6399-2 for the wind loads and thinking about using a lower probability factor (instead of the standard 50 year wind)
anyone got any experience in playing with these factors ?
any other suggestions ?
cheers
-Robert
-
|
|
|
|
|
Howlor
|
| posted on 7/10/09 at 07:10 PM |
|
|
It'l be reet!
|
|
|
mcerd1
|
| posted on 7/10/09 at 07:26 PM |
|
|
quote: Originally posted by Howlor
It'l be reet!
not at 900 tonnes of concrete for a tempary structure it won't
-
|
|
|
rachaeljf
|
| posted on 7/10/09 at 07:38 PM |
|
|
Annex D!
Read Annex D of 6399-2. It shows you how to derive different values of Sp for different return periods. If your structure will be up for only a year
for instance, you can use Sp = 0.749 (see Note 1). Using this, your qs will be reduced by 0.749^2, i.e. about 50%, quite a handy reduction!
Cheers R
|
|
|
Guinness
|
| posted on 7/10/09 at 08:37 PM |
|
|
What will it squash if it comes down?
A school? or some cows?
I'd be doing some risk analysis before taking out any strength from it.
Mike
|
|
|
mcerd1
|
| posted on 8/10/09 at 08:04 AM |
|
|
quote: Originally posted by Guinness
What will it squash if it comes down?
A school? or some cows?
I'd be doing some risk analysis before taking out any strength from it.
Mike
Its a crane in our own yard for errecting another structure
the problem is that I've no experience of risk assesment
thats why the initial design was for 50 year wind (Q= 0.02, Sp= 1.0)
so where do I find guidance on acceptable risks ?
-
|
|
|
rachaeljf
|
| posted on 8/10/09 at 08:49 PM |
|
|
Who is supplying the crane? They should do all that for you. Crane design is not quite the same as a normal structure, there are dynamic effects to
take into account.
|
|
|
mcerd1
|
| posted on 11/10/09 at 01:14 PM |
|
|
they arn't interested
-
|
|
|
rachaeljf
|
| posted on 17/10/09 at 09:47 PM |
|
|
It sounds like you are buying/hiring a pillar crane or the like, and you have to design your own support structure for it, using some 375 cubic metres
of concrete? I suggest you engage a structural engineer.
Cheers R
|
|
|
mcerd1
|
| posted on 18/10/09 at 05:53 PM |
|
|
its a beam crane
-
|
|
|
rachaeljf
|
| posted on 18/10/09 at 08:34 PM |
|
|
Well, give us some info on the crane and we might be able to help!
|
|
|
Peteff
|
| posted on 19/10/09 at 09:45 AM |
|
|
You can hire mobile cranes to lift up to 1300 tons nowadays. How much is the 900 ton block of concrete going to cost to get installed and removed if