someone please tell me i'll get it all done....
Oh yeah, missing off that list is 'wire up car'
you'll get it done.
Now ask me if i believe that ?
(actually i probably do)
Stop posting on here and get on with it then
You have about 23 items on that list and 17 days, that's little more than 1 a day.
Star with the little jobs and get them out of the way, then do the larger ones and you'll be done in no time
ATB
Simon
quote:
Originally posted by Simon
Stop posting on here and get on with it then
You have about 23 items on that list and 17 days, that's little more than 1 a day.
Star with the little jobs and get them out of the way, then do the larger ones and you'll be done in no time
ATB
Simon
Thing is, if you start the big jobs and they take longer than expected, you'll have a major headache getting all the little jobs done.
I reckon you could probably get rid of most of that list over a weekend, which then leaves you 14 days to do the (maybe) 5 or 6 bigger jobs (during
which you'll have another 2 weekends).
You need to plan, and stick to it, no getting sidetracked, as that really does knock your schedule
ATB
Simon
as said but plan to order the materials and tools also if you have a small moment use it for a small task its more efficient
You don't need to paint inside the bonnet for SVA.
So that's one out of the way already
David
Just dont leave it to the last minute to finish it.... because theres always something you'll find you've missed !
quote:
Originally posted by DavidM
You don't need to paint inside the bonnet for SVA.
So that's one out of the way already
David
If you're worried about the wiring, one of these may help.
todays progress....
hub nuts torqued and pinned
wings fitted and trimmed
Feeling horny....?!
Airbox rad and clean up.
Progress looks good and that airbox! I've just come in from the garage as well.