Simon
|
posted on 21/4/11 at 07:53 PM |
|
|
Planning permission granted, now what..
Ok, I know it sounds like a stupid question, but I'm trying to do this on a budget so haven't used an architect and will be using
individual trades to do what I can't.
I drew my own plans and they've been approved. Can I now start digging holes or knocking things down or is there something else I need to do
first.
FYI house extension involves building another storey on existing garage and building new porch and extending garage outwards (more room for
projects!!).
Cheers very much
ATB
Simon
|
|
|
Ben_Copeland
|
posted on 21/4/11 at 07:58 PM |
|
|
Next step is building regs. You need to submit to them to approve the structural calcs. Costs more money unfortunately.
Ben
Locost Map on Google Maps
Z20LET Astra Turbo, into a Haynes
Roadster
Enter Your Details Here
http://www.facebook.com/EquinoxProducts for all your bodywork needs!
|
|
Ben_Copeland
|
posted on 21/4/11 at 07:59 PM |
|
|
Ps. Im doing exactly the same. Own plans etc
Ben
Locost Map on Google Maps
Z20LET Astra Turbo, into a Haynes
Roadster
Enter Your Details Here
http://www.facebook.com/EquinoxProducts for all your bodywork needs!
|
|
loggyboy
|
posted on 21/4/11 at 08:00 PM |
|
|
Building control next
2 routes - plans or building notice.
Notice is slighty dearer on LA fees, but thats because the inspector comes out more often to check work.
Plans route means less LA fees, but you need someone to draw up technical plans and spec for the LA to approve, they will then come and inspect only
a few times.
If the build is more than just a few walls and a single pitch roof (ie steelwork, drainage, etc etc) then plans are better as you iron out the creases
before you start building. Also means your builder can quote more accurately.
Check planningportal.gov.uk for more info
|
|
JoelP
|
posted on 21/4/11 at 08:01 PM |
|
|
we've got an uncle to knock up out plans! The plan is to get a friends dad for the founds as he has a digger, then just get a bricklayer and
roofer, and do the rest myself.
As ben says, the building regs people will tell you how they want you to proceed, ie what order and speed, and what calcs they want to see in advance.
Beware! Bourettes is binfectious.
|
|
Rod Ends
|
posted on 21/4/11 at 08:05 PM |
|
|
Inevitably...
|
|
v8kid
|
posted on 21/4/11 at 08:21 PM |
|
|
Sook up to the building inspector he will be your best pal.
Our building inspector always has a hot cup of tea and a chocky biscuit waiting for him. As a result he would tell me where to go to buy stuff, the
best price, who to avoid and best of all where to cut corners and where not to. Also who in "the System" was who.
We saved £20k of our budget and ended up with an extra 48sqm as a result of the tips he passed on about "The Planning System" and surprise
surprise when we applied for the amendment it was passed first time
Cheers
You'd be surprised how quickly the sales people at B&Q try and assist you after ignoring you for the past 15 minutes when you try and start a
chainsaw
|
|
coozer
|
posted on 21/4/11 at 08:33 PM |
|
|
Yep, again the building inspector is your mate. Get onto him and ask him what to do first, call him out when its done and ask him what you need to do
for the next time he comes.
I built a 2 story extension on my house and did most of the stuff myself just calling in brick layers, plumbers etc when required.
He accepted I was doing it myself and guided me on how to, where to get stuff and how to do it.
1972 V8 Jago
1980 Z750
|
|
big-vee-twin
|
posted on 22/4/11 at 07:56 AM |
|
|
You will need and accredited energy assessor to do you a SAP calculation in order to pass part L of the building regulations
Duratec Engine is fitted, MS2 Extra V3 is assembled and tested, engine running, car now built. IVA passed 26/02/2016
http://www.triangleltd.com
|
|
loggyboy
|
posted on 22/4/11 at 08:13 AM |
|
|
quote: Originally posted by big-vee-twin
You will need and accredited energy assessor to do you a SAP calculation in order to pass part L of the building regulations
Im pretty sure extensions dont require SAP calcs, unless they have window area that equate to more than 25% of the floor area.
|
|
mcerd1
|
posted on 22/4/11 at 08:35 AM |
|
|
quote: Originally posted by Rod Ends
Inevitably...
coming soon from haynes: "how to build your own home for as little as £250 - and live in it!"
-
|
|
gottabedone
|
posted on 22/4/11 at 09:23 AM |
|
|
Everybody needs their ego polished at times so make friends with the delivery driver from Jewsons/Kellaways or whichever you use. I live on a big
slope and the Kellaways driver does his best to drop my deliveries as close to where i need them as possible.
Steve
|
|